Completed Floor Preparation Project
WSFS Bank — Bryn Mawr, PA
Glue and adhesive removal · Floor preparation · Floor leveling
Completed · October 2026
Preparing the existing floor for its next installation
Completed glue and adhesive removal, floor preparation and floor leveling at WSFS Bank in Bryn Mawr, Pennsylvania.
The work addressed the existing flooring adhesive and included leveling the floor as part of preparation for the next flooring installation.
The photos below document earlier stages of this completed project.

Starting conditions: existing glue and adhesive

Removal and leveling
The existing floor needed glue and adhesive removal before the next flooring installation. MJ’s completed scope also included floor leveling.
These original site photos show the initial adhesive condition and our crew performing preparation work. They were also used in the project’s Facebook and Instagram updates.
Explore concrete floor preparation, grinding and refinishing services.
Planning a commercial floor renovation?
Send your location, approximate floor area, condition photos and schedule to jeff@mjstonetile.com. Preliminary pricing can start with these details, with a site visit if required before contract.
Send Plans